PLUG and PLAY
USER FRIENDLY
SECURE
DURABLE
ECO FRIENDLY

EMS - Energy Monitoring System

Highly efficient and customized solution for simultaneously analyzing up to 60 different electricity meters with just one central unit for comprehensive and efficient monitoring of energy consumption. 

With reliable measurement results, the read data is presented in a user-friendly manner and in real-time on dashboards or as reports within just a few minutes. This system allows not only detailed analysis of individual devices and machines but also monitoring of total energy consumption. 

Quick identification of energy consumption patterns, peak loads, trends, and deviations.
By implementing an energy monitoring system, companies and organizations can effectively manage their energy consumption, monitor energy flows, reduce costs, improve energy efficiency, and achieve their sustainability goals faster. 

Key features: 
  • single ESERA central unit 
  • up to 60 electricity meters
  • up to 4.5 MWh of electricity consumption/production 
  • data storage for 151 years

Tip
Shipping until
2-fold DI counter module (Digital Input S0 Counter)
The 1-Wire meter module is suitable for recording energy from two independent electricity, water and gas meters. The metering pulses of a wind turbine can also be recorded. In principle, all S0 devices manufactured in accordance with DIN 43864 with an insulated S0 interface can be connected to the module. The counted pulse levels are retained for several days due to the internal voltage buffering and can be read out with a time delay via the 1-Wire bus. A maintenance-free GoldCap (high-performance capacitor) is integrated to buffer the meter values.

From €59.31*

Product number: 11211

Instantly available
Shipping until , if you place your order within the next .
Tip
Shipping until
ECO 531 Central Unit Industrial Multizone 1-Wire Sensor-Actor-Gateway
The ECO 531 central device/gateway is a modern system bus interface for the comprehensive monitoring and control of systems. It integrates up to 30 sensors and actuators via the Industrial 1-Wire bus and the Auto-E-Connect plug-and-play system. The ECO central units are low-maintenance industrial devices that have been the standard for 1-Wire bus systems for over 10 years, offer stability and meet a high "security by design" standard. The gateway can be controlled in parallel by PLC controllers, cloud applications and text protocols through BMS and media control systems. The simple installation of complex networks is facilitated by the integrated 1-Wire Zone feature. ESERA offers a wide range of sensors and actuators for the gateway. User-friendliness is reflected in the intuitive and simple configuration, software updates and provision of data via the web server, accessible via LAN or the access point that can be activated at the touch of a button. HIGHLIGHTS Three 1-wire bus zones, fully automatic Auto-E-Connect plug-and-play system for up to 30 sensors Web server and access point for data, configuration, debug and firmware updates Data interface for Modbus/TCP, MQTT and ASCII Native programming, without Linux and without unknown libraries Device security through secure boot and updates with encrypted SSL certificate Robust and low-maintenance industrial design with extensive device protection, suitable for extended temperature range from -20°C to 50°C Applications Suitable for complex 1-wire networks: Industrial plants Mechanical engineering Building management, IoT and M2M, silo monitoring Energy optimization in many application areas, can be used regardless of manufacturer Optional equipment Ultrafast iButton or RFID Read function for access or security authentication TPM (Trusted Platform Module) hardware for secure boot and SSL certificates Optional firmware versions, e.g. for 1-wire memory (EEPROM) and read iButton without programming Customization and branding possible Note: The article is not delivered to Great Britain !

From €332.70*

Product number: 11624-24

Instantly available
Shipping until , if you place your order within the next .